Construction Procurement Software, Process and Methods for UAE Contractors
Construction procurement software explained: methods, the procure-to-pay process and how ERP gives UAE contractors real-time control of spend.
Five industries worked hands on, so we arrive knowing where the gaps usually are.
All industries →Request a demoFour ERP platforms in house, and fifteen capability modules. The recommendation is never tied to a licence quota.
All solutions →Request a demoOne team from platform selection through to the reports on your desk.
All services →Request a demoGuides, how-tos, comparisons and a plain-English glossary, written by the consultants who deliver the projects. No form in front of any of it.
Nobody in UAE ERP publishes their tools or their pricing. We do both.
Free tools →Request a demoAn ERP and IT consultancy in Business Bay, Dubai, implementing Oracle, Microsoft, Odoo and SAP across the UAE and GCC.
Consultants in the UAE, technical team in South Asia. Cost stays sharp without cutting corners.
About QZ Infomatics →Request a demoWhat are shop drawings and as-built drawings? A guide to submittals, RFIs and document control in construction.

Last updated: October 2026 · By the QZ Infomatics Construction Technology Team
A construction project runs on drawings, but not the ones most people picture. Between the architect’s design and the finished building sits a constant flow of shop drawings, submittals, requests for information, and finally as-built drawings, and every one of them has to be produced, reviewed, approved, and tracked. When that flow breaks down, work stops, rework piles up, and the programme slips. This guide explains what shop drawings and as-built drawings are, how the submittal and RFI process works, and how the right construction document control software keeps it all under control.
Shop drawings are detailed drawings prepared by a contractor, subcontractor, or supplier that show exactly how a specific element of the works will be fabricated and installed. They translate the designer’s intent into precise, buildable detail.
Where an architect’s or engineer’s drawings show what is required, shop drawings show exactly how it will be made and fitted, with dimensions, materials, connections, and fixing details specific to the actual products being used. They are produced for things like structural steel, reinforcement, ductwork, cladding, joinery, and MEP (mechanical, electrical, and plumbing) systems.
Crucially, shop drawings are submitted to the consultant for review and approval before fabrication begins. This check ensures the contractor’s proposed detail matches the design and the specification, catching clashes and errors on paper rather than on site.
The shop drawing approval process is the review cycle in which a contractor submits shop drawings to the consultant, who reviews and returns them marked approved, approved with comments, or rejected. Nothing is fabricated until the drawings are approved.

The typical cycle runs like this:
Each loop takes time, and on a busy project there may be hundreds of these cycles running at once. Tracking which drawings are submitted, pending, approved, or overdue is a major coordination task, and delays in approval directly hold up procurement and construction.
As-built drawings are the final set of drawings that record exactly how the project was actually constructed, including every change made during the build. They are the definitive record of the finished asset.
Over the course of a project, the design almost always changes, through variations, site instructions, and practical adjustments made during construction. As-built drawings capture all of these, so the final drawings reflect reality rather than the original design.
The as-built drawings meaning matters most at handover and beyond. They are handed to the client as part of the operation and maintenance documentation, and they become the reference the facilities team relies on for years, whenever the building is maintained, altered, or extended. Inaccurate as-builts cause expensive problems long after the contractor has left.
The difference is timing and purpose: shop drawings are produced before construction to show how work will be built, while as-built drawings are produced during and after construction to record how it was actually built. One looks forward, the other looks back.
Shop drawings are a pre-construction approval tool, confirming the detail before fabrication. As-built drawings are a post-construction record, documenting the finished reality for the client and the facilities team.
Both are essential, and both are part of the wider set of construction drawings that also includes the designer’s drawings and, increasingly, 3D models. When those models are used, as-built information often feeds into the digital record, which is where building information modeling (BIM) and the handover model come in.
A submittal is any document, sample, or drawing a contractor provides to the consultant for review to confirm it meets the contract requirements before work proceeds. Shop drawings are the most common type, but submittals cover much more.
Construction submittals typically include shop drawings, material samples, product data sheets, method statements, mock-ups, test certificates, and manufacturer’s information. Each one is a checkpoint where the consultant confirms that what the contractor intends to use or do complies with the specification.
The submittal process is the backbone of quality control on a project. It sits alongside the method statements that govern how work is carried out safely, and together they form the paper trail that proves the works were built to specification. Managing this volume of submittals, and their review status, is a significant administrative undertaking.
An RFI, or request for information, is a formal query a contractor raises when something in the drawings or specification is unclear, incomplete, or contradictory, and a written answer is needed before work can proceed. It is one of the most important communication tools on any project.
When a contractor hits an ambiguity, a missing dimension, a clash between drawings, or a conflict between the design and site conditions, they raise an RFI to the consultant and wait for a formal response. That response becomes part of the project record and may change how the work is done.
RFIs are not just paperwork; they carry real cost and time. A widely cited industry benchmark from the Navigant Construction Forum found that the average RFI costs around 1,080 US dollars in review labour, projects average close to 9.9 RFIs per million dollars of construction value, and the average RFI stays open about 9.7 days awaiting a response. On a large project, that adds up to hundreds of RFIs and significant cost and delay, which is why fast, tracked RFI management matters so much.
RFIs, submittals, and variations are linked stages in the flow of information and change on a project, and an answer to one often triggers the next. Understanding the chain helps keep a project under control.
An RFI frequently reveals that something needs to change, and that change may become a formal variation to the contract, with cost and time implications. A new or revised detail then needs fresh shop drawings, which go through the submittal and approval process again. Each step depends on the one before.
This is why these processes cannot be managed in isolation. A single unanswered RFI can stall a submittal, delay fabrication, and push out the programme, and an unrecorded change can turn into a dispute. Connecting them to the commercial side, including variation orders and construction contracts, keeps both the technical and the financial record straight.
A material requisition is an internal request to purchase the materials needed for the works, usually raised once the relevant shop drawings are approved and the quantities are known. It is the bridge between the drawing office and procurement.
Approved shop drawings confirm exactly what materials, in what quantities, are required, which is what triggers the material requisition and the purchase that follows. Ordering before approval risks buying the wrong thing; ordering too late delays the work.
This links the drawing and submittal process directly to construction procurement and the wider supply chain. When drawings, requisitions, and purchase orders are connected, materials arrive on time and match what was approved, which keeps the site moving.
Document control matters because construction generates an enormous volume of drawings and documents that all have versions, approvals, and deadlines, and losing track of them causes delays, rework, and disputes. It is the discipline that keeps the paper flow under control.
The core risk is version confusion: someone building from a superseded drawing, a submittal lost in an email chain, or an RFI that never gets answered. Each of these causes rework, and rework is one of the largest avoidable costs in construction. Clear document control ensures everyone works from the current, approved information.
Good document control also creates an audit trail. When a dispute arises over who approved what and when, a clean record of transmittals, submittals, RFIs, and approvals is the contractor’s best protection. This is exactly what dedicated document control software is built to provide.
The main challenges of managing drawings and submittals manually are version control, slow approvals, and no clear status visibility. Spreadsheets and email simply cannot keep up with the volume.
Common problems include:
Each of these traces back to a disconnected, manual process. On a large project with thousands of documents, the administrative burden alone becomes a serious risk to the programme.
Construction software manages drawings and submittals by storing every document with its version and approval status in one place, routing reviews automatically, and giving the whole team a live view of what is pending and overdue. It replaces the spreadsheet-and-email scramble with control.
A good system keeps a single source of truth for every drawing, tracks each submittal and RFI through its review cycle, enforces version control so no one builds from superseded information, and maintains a complete audit trail of every transmittal and approval. Nothing gets lost, and the status of every document is visible at a glance.
This capability is increasingly part of a wider construction ERP, so that document control connects to the commercial and procurement side rather than sitting in a silo. Platforms such as Odoo, configured for construction, can bring document management together with procurement, cost control, and billing, and a well-run ERP implementation is what makes that integration reliable.
In the UAE, rigorous document control is especially important given the scale of projects, the number of parties involved, and the consultant-led approval culture. Contractors here manage heavy submittal and approval workloads.
UAE projects typically involve a client, a lead consultant, multiple subconsultants, a main contractor, and many subcontractors, all exchanging drawings and submittals under FIDIC-based contracts that place formal weight on notices, approvals, and records. The volume of shop drawings and RFIs on a large tower or infrastructure project is substantial, and keeping it organised is a real competitive advantage.
For UAE contractors, connecting document control to the rest of the project, from procurement to cost control, is a genuine edge. If you want the wider context on the systems behind this, our complete guide to construction ERP in the UAE sets the foundation, and our main construction ERP software page shows how it fits together.
Controlling drawings and submittals comes down to one connected system where every document, approval, and query is tracked against the project. That control is what protects the programme from avoidable delay and rework.
A practical step is to move shop drawings, submittals, RFIs, and as-built records off email and spreadsheets into a construction-specific system, so versions are controlled, approvals are routed and tracked, and nothing stalls unnoticed. This turns document control from an administrative risk into a source of programme certainty.
If you would like help with that, our construction ERP software for UAE contractors brings document control, procurement, BOQ, cost control, and billing into one platform, built for how contracting businesses actually work.
To recap the essentials:
Drawings and documents are the information backbone of a construction project. Managing them in one connected, controlled system, rather than a scatter of emails and spreadsheets, is one of the most direct ways a UAE contractor can protect both quality and programme.
QZ Infomatics Construction Technology Team – QZ Infomatics is a Dubai-based ERP and IT consultancy (Business Bay) that implements construction and contracting software across the UAE and GCC. The team helps contractors manage shop drawings, submittals, RFIs, and as-built records alongside procurement, cost control, and billing in one connected system, drawing on hands-on experience with construction ERP for UAE projects. This guide reflects that practical experience helping contracting businesses keep their drawings and documents under control.
Managing drawings and submittals on email and spreadsheets? See our construction ERP for UAE contractors.
Frequently asked questions
Shop drawings are detailed drawings prepared by a contractor, subcontractor, or supplier showing exactly how a specific element will be fabricated and installed. They are submitted to the consultant for approval before fabrication begins.
As-built drawings are the final drawings recording how the project was actually constructed, including every change made during the build. They form the definitive record handed to the client for operation and maintenance.
Shop drawings are produced before construction to show how work will be built and are approved before fabrication. As-built drawings are produced during and after construction to record how it was actually built.
A submittal is any document, sample, or drawing a contractor provides for review to confirm it meets the contract requirements before work proceeds. It includes shop drawings, samples, product data, test certificates, and more.
An RFI, or request for information, is a formal query a contractor raises when drawings or specifications are unclear, incomplete, or contradictory. A written response is needed before work can proceed, and it becomes part of the project record.
A widely cited industry benchmark puts the average RFI at around 1,080 US dollars in review labour, with projects averaging close to 9.9 RFIs per million dollars of value and an average response time of about 9.7 days.
The contractor submits shop drawings to the consultant, who reviews and returns them marked approved, approved with comments, revise and resubmit, or rejected. Only approved drawings are released for fabrication.
Because construction generates a huge volume of drawings and documents with versions, approvals, and deadlines. Good document control prevents version confusion, lost submittals, and slow approvals, all of which cause costly rework and disputes.
Talk to a consultant
Book a free 30 minute call with QZ Infomatics in Dubai. You will leave it with a platform recommendation, the reasoning behind it, a realistic timeline and an indicative budget band — before you commit to anything.
Please tell us your name.
Start chat on WhatsAppWhatsApp will open with your message written. You press send.
Your message is already written — press send in WhatsApp and we will pick it up.
If it cannot wait, call +971 4 243 4010.
Still nothing? Leave your email and we will reply there instead.
Or write to info@qzinfomatics.com.